{"id":116,"date":"2022-05-16T19:02:41","date_gmt":"2022-05-16T23:02:41","guid":{"rendered":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/?post_type=part&#038;p=116"},"modified":"2022-05-16T19:02:41","modified_gmt":"2022-05-16T23:02:41","slug":"competency-b2-install-potable-water-distribution-systems","status":"publish","type":"part","link":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/part\/competency-b2-install-potable-water-distribution-systems\/","title":{"raw":"Competency B2: Install Potable Water Distribution Systems","rendered":"Competency B2: Install Potable Water Distribution Systems"},"content":{"raw":"The building water service pipe and the building water distribution system make up the building water supply system. This competency will cover the design, sizing and installation of the building water supply system.\r\n<div class=\"textbox textbox--learning-objectives\"><header class=\"textbox__header\">\r\n<p class=\"textbox__title\">Learning Objectives<\/p>\r\n\r\n<\/header>\r\n<div class=\"textbox__content\">\r\n\r\nAfter completing the learning tasks in this Competency, you will be able to:\r\n<ul>\r\n \t<li>Interpret the National Plumbing Code (NPC) Section 6, potable water systems;<\/li>\r\n \t<li>Describe the building potable water supply system;<\/li>\r\n \t<li>Size pipe for potable water service and distribution systems; and<\/li>\r\n \t<li>Describe the installation of piping for potable water service and distribution systems.<\/li>\r\n<\/ul>\r\n<\/div>\r\n<\/div>\r\n<h1>Resources<\/h1>\r\nYou will be required to reference the most current British Columbia Plumbing Code.","rendered":"<p>The building water service pipe and the building water distribution system make up the building water supply system. This competency will cover the design, sizing and installation of the building water supply system.<\/p>\n<div class=\"textbox textbox--learning-objectives\">\n<header class=\"textbox__header\">\n<p class=\"textbox__title\">Learning Objectives<\/p>\n<\/header>\n<div class=\"textbox__content\">\n<p>After completing the learning tasks in this Competency, you will be able to:<\/p>\n<ul>\n<li>Interpret the National Plumbing Code (NPC) Section 6, potable water systems;<\/li>\n<li>Describe the building potable water supply system;<\/li>\n<li>Size pipe for potable water service and distribution systems; and<\/li>\n<li>Describe the installation of piping for potable water service and distribution systems.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<h1>Resources<\/h1>\n<p>You will be required to reference the most current British Columbia Plumbing Code.<\/p>\n","protected":false},"parent":0,"menu_order":2,"template":"","meta":{"pb_part_invisible":false,"pb_part_invisible_string":""},"contributor":[],"license":[],"class_list":["post-116","part","type-part","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/pressbooks\/v2\/parts\/116","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/pressbooks\/v2\/parts"}],"about":[{"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/wp\/v2\/types\/part"}],"version-history":[{"count":1,"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/pressbooks\/v2\/parts\/116\/revisions"}],"predecessor-version":[{"id":117,"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/pressbooks\/v2\/parts\/116\/revisions\/117"}],"wp:attachment":[{"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/wp\/v2\/media?parent=116"}],"wp:term":[{"taxonomy":"contributor","embeddable":true,"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/wp\/v2\/contributor?post=116"},{"taxonomy":"license","embeddable":true,"href":"https:\/\/pressbooks.bccampus.ca\/plumbing3b\/wp-json\/wp\/v2\/license?post=116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}