Chapter 4 – British Columbia Engineering Failures
2012 and 2016 – Engineering Design Problems – Port Mann Bridge Surrey 2012 and 2016 – ice bombs
There was a design failure of the “new” Port Mann bridge when due to ice falling off the cables many cars were damaged.
https://en.wikipedia.org/wiki/Port_Mann_Bridge