Chapter 4 – British Columbia Engineering Failures

2012 and 2016 – Engineering Design Problems – Port Mann Bridge Surrey 2012 and 2016 – ice bombs

There was a design failure of the “new” Port Mann bridge when due to ice falling off the cables many cars were damaged.

 

https://en.wikipedia.org/wiki/Port_Mann_Bridge

 

 

 

License

Engineering and Technology in Society - Canada Copyright © by Jennifer Kirkey. All Rights Reserved.

Share This Book