"

4 Building Bond Graph Models: General Procedure and Application

Media Attributions

  • fig4-3

  1. Recall that 1- junction is a flow equalizer (or effort summator) and 0-junction is an effort equalizer (or flow summator).

License

Icon for the Creative Commons Attribution-NonCommercial 4.0 International License

Engineering Systems Dynamics, Modelling, Simulation, and Design Copyright © 2021 by Mehrzad Tabatabaian is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License, except where otherwise noted.

Share This Book